THE STARTING POINT
Select a system against the requirements for your exact project. Request current approval documents and installation details before finalizing the opening.
Begin with the site
Give your architect, builder, and Lanai team the project address, opening dimensions, building plans, and an explanation of the exposure. An ocean-facing opening, sheltered courtyard, and elevated balcony may call for different design decisions.
Ask the project design professional to establish the required design pressures, impact requirements where applicable, and the documentation needed by the permitting authority. Do not select a system from a general wind-speed headline.
Ask for the approval that matches the order
Lanai offers impact-rated folding door and window systems. Product families, configurations, and approval documents must be matched to the intended installation; a family name or approval logo alone is not enough.
The current document
Request the applicable approval number, revision, validity, and supporting installation instructions. Have the project team confirm acceptance for the jurisdiction.
The exact configuration
Check dimensions, panel quantity, opening direction, glass construction, threshold, and hardware against the approval limitations.
The building connection
Coordinate the substrate, anchors, spacing, edge distances, and structural support using the applicable approved details.
Treat the threshold as a design decision
Discuss weather exposure, finished-floor levels, the desired transition, overhangs, and drainage together. A low or flush appearance does not establish water performance.
The supplied 2019 E3 aluminum guide distinguishes standard, lowrise, and flush-guide arrangements. It calls for keeping standard-sill weep paths open and for drainage design by others with lowrise or flush arrangements. Use the current instructions and approved details for the system you actually order.
Plan for salt, sand, and service access
Ask for the care schedule and approved cleaning methods for the selected finish, glazing, seals, and hardware. Make routine cleaning and inspection possible without moving permanent furniture or finishes.
Include the owner or facilities team in the handover. Keep the order information, approved drawings, maintenance instructions, and warranty together so future service starts with the correct system details.
Before you order
Send the site requirements and proposed opening to Lanai for a configuration review, then have your project professionals confirm the final selection and installation details.
References & next-step documents
Planning guidance to support your conversation with Lanai and your project team. Product availability, technical details, and applicable requirements should be confirmed for your order.
Lanai impact-rated product information (request current approval documents) E3 Aluminum installation guide · October 2019 · PDF Lanai Doors support and product information